It's a dilemma faced by IT administrators everywhere. "We ran out of rack space, air conditioning capacity, and UPSes at the end of 2004, but we needed more servers," recalls George Rapp, senior vice president of IT for Stonebridge Bank, a regional institution in Pennsylvania. Getting more power in and more heat out was just not an option for the bank's datacenter, so Rapp consolidated multiple Unix servers into one box to reduce the physical footprint and delay the crisis. "But it got us only part of the way," he notes.
In 2005, EMC released VMware ESX version 2, giving Rapp a practical server virtualization option for the first time. By converting physical servers to virtual ones, several of which can run at a time on one physical server, the bank has dodged the capacity bullet. It has gone from having 131 physical servers to just 26, even though it has more server instances, and thus needs just two of its five racks and 37 percent of its UPS capacity. Even as the bank grows, it will be at least five years before server growth pushes its datacenter's physical space, power, and heat limits, Rapp says.
Today, the bank uses three Hewlett-Packard DL-585 servers to run VMware, each with four dual-core CPUs and 32GB of RAM. Rapp chose the AMD-powered DL-385 over the Intel-powered DL-380 model because his tests showed the DL-385 could run about 25 VMs while the DL-380 could run just 12. "We have 77 critical VMs on the three servers," Rapp notes.
Putting so many eggs in one basket can increase risk if a physical server fails, so he hasn't fully loaded any of the DL-585s. Worst case: One physical server could run all the mission-critical VMs, Rapp says. To further ensure availability in case of disaster, the bank has connected all the servers via SAN, so it can quickly move the server images to other equipment if necessary, using the EMC VMotion utility. (VMotion requires that all servers have the same CPU family, forcing a full refresh for all VMware servers, rather than permitting an incremental replacement strategy, Rapp notes.) The VM configuration software also resides on the SAN, so it is available no matter what VMware servers are up. "We realized that it [the VM image] is just data," he says.
The deployment of virtual servers as image data on a SAN also has reduced data management costs and the IT staff's travel requirements, Rapp notes. The bank needs fewer backup agents and defragmentation applications because it has fewer physical servers, he says, citing a cost decline from $230 per server per month to $31. Travel needs are reduced because if a server doesn't come up properly, IT staff can just reload the image from headquarters, saving a drive of as much as 260 miles round trip. "It's easier to manage remote branches now," Rapp says. Even at headquarters, "we don't even go into the server room any more," he says. "We don't even turn on the lights." Before using virtualization, IT staff had to go in several times a day to deal with server maintenance.

Sign up to receive Hardware Resource Alerts